Rental make-ready timeline calculator
Add cleaning, repairs, inspection, and marketing-preparation days to create a basic make-ready schedule.
The short answer
Last updated: July 2026
A sequential make-ready timeline is the sum of the task durations you enter. This calculator is a planning aid; tasks may run in parallel and it does not set a legal deadline.
After the estimate:
Join the waitlistMake-ready timeline calculator
Plan a turnover make-ready timeline.
Add the days you expect for cleaning, repairs, inspection, and marketing preparation to create a simple sequential schedule.
Cleaning days
days
Repair days
days
Inspection days
days
Marketing preparation days
days
Input-driven result
Your inputs
Formula
Result below
Sequential make-ready timeline
9 days
2 cleaning + 4 repairs + 1 inspection + 2 marketing prep.
Estimate based on your inputs. Not a promise of results.
Planning estimate only. Tasks may run in parallel, vendor availability can change, and this does not set a legal turnover deadline.
How it works
How this tool works.
Rental make-ready timeline calculator turns the inputs you provide into a clear operational planning number.
Use it alongside the documents, professional judgment, and local requirements that apply to your rental.
Make the result useful
How long should a rental make-ready take between tenants?
A make-ready timeline is a sequence of verifiable handoffs: possession, inspection, scope approval, cleaning, repairs, quality check, and listing readiness. This calculator turns the workdays you enter into a planning window so leasing and vendor coordination are not treated as afterthoughts.
Do not assume every task must be sequential. Photos can be scheduled after cleaning, while a paint touch-up may run alongside a minor repair. The critical path is the longest dependency chain, not necessarily the sum of every task.
Calculation lens
sequential baseline days = cleaning days + repair days + inspection days + marketing-prep days
The output is a conservative sequential planning estimate. Use a task board to identify safe parallel work.
Vendor availability, resident possession, material lead times, local habitability duties, and leasing demand are not predicted.
Should I list before every repair is complete?
Only when the unit can be accurately represented and your schedule supports a clear availability date. Keep marketing claims aligned with actual readiness.
What is the critical path?
It is the chain of dependent tasks that determines the earliest realistic ready date.
Does a faster make-ready always mean lower cost?
No. Rush charges, rework, and quality failures can make a shorter calendar period more expensive.
Questions landlords ask
Questions about this tool and its limits.
Built by a landlord who's done every one of these jobs by hand.
Aptoria was built by an owner-operator managing a Brooklyn portfolio — the 11pm calls, the awkward rent texts, the April receipt-pile — not by a software team guessing at the problem.
Keep exploring